SOW Report
Contract 56662 REL 265: 2009-003-00 EXP UPPER COLUMBIA STAFF AND SUBS
Project Number:
Title:
Upper Columbia Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 20.00%
Methow 40.00%
Wenatchee 40.00%
Contract Number:
56662 REL 265
Contract Title:
2009-003-00 EXP UPPER COLUMBIA STAFF AND SUBS
Contract Continuation:
Previous: Next:
56662 REL 215: 2009-003-00 EXP UPPER COLUMBIA STAFF AND SUBS
Contract Status:
Issued
Contract Description:
This contract will replace Contract 56662 REL 215 to cover YN Fisheries UCHRP staff costs, project overhead costs, and on-call service subcontract costs over the June 1, 2022 to May 31, 2023 performance period.  In addition, all BPA funded property inventory for the UCHRP will be reported under this contract.  This Contract includes the wages and overhead expenses of Yakama Nation staff working on accounting, budgeting, reporting, restoration project management, and subcontract management during the 1 year performance period.

The on-call subcontract work elements provided in this Contract allow the Yakama Nation to more efficiently conduct subcontracting for redundant yet critical site assessment, design, and post construction maintenance activities across our work region, increasing the efficiency to produce individual restoration projects that yield habitat mitigation credits for the Federal Columbia River Power System.  Topographic surveys, large wood haul, groundwater testing, native plant revegetation planning, and providing maintenance of vegetation and habitat structures on completed project sites are all restoration related activities that must be completed on all or most restoration project sites, yet these project elements are not the core restoration project elements that actually produce mitigation credits under the FCRPS BiOP.  Given the large number of projects Yakama Nation Fisheries is developing simultaneously, if the program were to break apart these redundant project support activities as separate work elements for each restoration project site, the Yakama Nation Accord contracts would be infinitely more complex and overloaded with redundant WEs and a confusion of related milestones and milestone dates, making it very hard to produce and review CRs and CCRs.  Also, this would likely require the Yakama Nation to request more CCRs more often as these critical yet redundant work elements become needed on individual projects at differing times in the project development and completion process.  Additionally, the Tribal contracting process would be overrun and dramatically slowed down by a need to constantly produce and modify subcontracts for redundant services with the same contractors on different work sites.  These effects would greatly impede the Yakama Nation's ability to produce the quantity of habitat restoration projects within the time frame of the Accords.

This "Staff and Subs" Contract will provide all needed support services for the YN Fisheries UCHRP to continue operations in the Upper Columbia Basin from June 1, 2022 to May 31, 2023.  Detailed work elements for implementation of specific restoration actions that are directly applicable to mitigation credits under the FCRPS BiOP are provided in separate Accord Contracts known as "Habitat Restoration Contracts".

Work Element actions in 2022 Habitat Restoration Contracts include:

DESIGN PROJECTS (2022 ENGINEERING AND DESIGN PROJECTS)

Methow Subbasin:
Lower Twisp Assessment Unit - Twisp Horseshoe Phase 3 Side Channel and Newby Narrows Phase 2
Middle Twisp Assessment Unit - Scaffold Camp Side Channel
Methow River-Fawn Creek Assessment Unit - Methow Basin EWD Instream Flow Project
Wolf Creek Assessment Unit - Wolf Creek USFS
Chewuch River-Doe Creek Assessment Unit - Chewuch Old Yeller (USFS Lands)
Chewuch River-Pearrygin Creek Assessment Unit - Chewuch Root Canal

Wenatchee Subbasin:
Lower Nason Creek Assessment Unit - Nason Creek N1 DOT Project and Upper Nason Creek Project (USFS Lands)
Lower Chiwawa River Assessment Unit - Chiwawa Outlet Restoration and Lower Chiwawa USFS
Wenatchee River-Nahahum Canyon Assessment Unit - Lower Wenatchee River Reach 3 Restoration

Entiat Subbasin:
Mad River Assessment Unit - Mad River (USFS) Projects and Mad River Outlet

RESTORATION ACTIONS (2022 CONSTRUCTION ACTIONS)

Methow Subbasin:
Lower Twisp Assessment Unit - Upper Twisp River and Tributaries Project (USFS Lands – Little Bridge Creek) and Twisp Horseshoe Phase 2 Large Wood Structures
Middle Twisp Assessment Unit - Upper Twisp River and Tributaries Project (USFS Lands – War and Mystery)
Methow River-Fawn Creek Assessment Unit - Fawn Creek Large Wood Restoration
Methow River-Alder Creek Assessment Unit - M2 Alder Creek Floodplain Side Channel Restoration

Entiat Subbasin:
Entiat River-Lake Creek Assessment Unit - Entiat Silver Falls Restoration    

*** Due to entity level constraints in transfering unallocated monies from FY 21 to FY 22 to fund this contract at the expected amount of $3,538,564, this scope of this CR 352816 has been reduced by $1.8 million to accomodate the June 1, 2022 contract start date.  It is anticipated that a CCR will be completed for this agreement to add back in FY 22 or FY 23 unallocated monies before December 2022 so that the 2022 and 2023 planned habitat restoration activities can continue uninterrupted.
Account Type(s):
Expense
Contract Start Date:
06/01/2022
Contract End Date:
05/31/2023
Current Contract Value:
$1,721,238
Expenditures:
$1,376,990

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration Yes Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Victoria Bohlen Bonneville Power Administration Yes COR vlbohlen@bpa.gov (503) 230-3506
Jason Breidert Yakama Confederated Tribes Yes Technical Contact brej@yakamafish-nsn.gov (509) 860-5351
Chris Butler Yakama Confederated Tribes Yes Technical Contact butlerc@yakamafish-nsn.gov (509) 449-8215
Christopher Clemons Yakama Confederated Tribes Yes Technical Contact clec@yakamafish-nsn.gov (509) 881-5746
Joseph Connor Bonneville Power Administration Yes F&W Approver jwconnor@bpa.gov (503) 230-3172
Annet Dillman Yakama Confederated Tribes Yes Administrative Contact dila@yakamafish-nsn.gov (509) 865-2255
Madeleine Eckmann Yakama Confederated Tribes Yes Technical Contact eckm@yakamafish-nsn.gov (509) 449-2091
Tana Hoptowit Yakama Confederated Tribes Yes Administrative Contact hopt@yakamafish-nsn.gov (509) 865-5121x6318
Jarred Johnson Yakama Confederated Tribes Yes Technical Contact johj@yakamafish-nsn.gov (509) 881-1462
Jennifer McKenna Bonneville Power Administration No CO Assistant jmmckenna@bpa.gov (503) 314-8915
Jessica Power Bonneville Power Administration Yes CO Assistant jdpower@bpa.gov (503) 230-4023
Brandon Rogers Yakama Confederated Tribes Yes Supervisor rogb@yakamafish-nsn.gov (509) 949-4109
Hans Smith Yakama Confederated Tribes Yes Contract Manager h.smith@methownet.com (509) 449-2750
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Annual progress report, uploaded to Pisces B: 132. Annual Progress Report for 2022 05/31/2023
Effective implementation management and timely contract administration C: 119. Manage personnel, property and subcontracts for overall UCHRP 05/31/2023 05/31/2023
Wetland Surveys and Reports D: 165. UC Wetland Delineation 2010-44 05/31/2023 05/31/2023
Landowner Outreach completed E: 191. CCD Landowner Outreach & Coordination - 2010-60 05/31/2023 05/31/2023
Chelan NRD Support/Outreach for Wenatchee Habitat Projects F: 191. Outreach Supporting Habitat Restoration Activities (Wenatchee) CCNRD 2012-98 05/31/2023 05/31/2023
Produce Survey G: 172. UC Professional Land Survey Contract 2015-128 05/31/2023 05/31/2023
Produce Cultural Surveys H: 165. UC Cultural Resource Contract 2014-118 05/31/2023 05/31/2023
Provide Scientific Support for YN UCHRP Projects I: 122. UC On-Call Scientific Support (Review and Recommendation) 2016-159 05/31/2023 05/31/2023
Provide Coordination on Restoration Work Proposed by the YN on WDFW Land J: 122. WDFW MOU Review 2016-157 05/31/2023 05/31/2023
Groundwater pump tests complete K: 208. Install Piezometer Wells and Conduct Groundwater Pump Tests 2010-37 05/31/2023 05/31/2023
LWD Procurement and Hauling L: 29. Large Wood Procurement - 2010-59 05/31/2023 05/31/2023
Large Wood Stockpile Locations Secured by Rental Agreements M: 92. UC Large Wood Storage 2015-131 05/31/2023 05/31/2023
Produce Native Plant Restoration and Soil Bio-Engineering Design, Materials, and Installation N: 47. UC Native Plant Restoration and Soil Bio-Engineering - 2010-62 05/31/2023 05/31/2023
Vegetation Maintenance O: 198. Methow Subbasin Vegetation Maintenance - 2010-43 05/31/2023 05/31/2023
Vegetation Maintenance P: 198. Vegetation Maintenance Wenatchee & Entiat 2012-84 05/31/2023 05/31/2023
Tree Tipping Consuting and Implementation Q: 29. UC Strategic Tree Recruitment Services 2022-216 05/31/2023 05/31/2023

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 2 instances of WE 198 Maintain Vegetation
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 92 Lease Land
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 208 Irrigation Infrastructure Construction or Replacement
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 2 instances of WE 198 Maintain Vegetation
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 92 Lease Land
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 208 Irrigation Infrastructure Construction or Replacement

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 132 Annual Progress Report for 2022
C 119 Manage personnel, property and subcontracts for overall UCHRP
D 165 UC Wetland Delineation 2010-44
E 191 CCD Landowner Outreach & Coordination - 2010-60
F 191 Outreach Supporting Habitat Restoration Activities (Wenatchee) CCNRD 2012-98
G 172 UC Professional Land Survey Contract 2015-128
H 165 UC Cultural Resource Contract 2014-118
I 122 UC On-Call Scientific Support (Review and Recommendation) 2016-159
J 122 WDFW MOU Review 2016-157
K 208 Install Piezometer Wells and Conduct Groundwater Pump Tests 2010-37 06/01/2022
L 29 Large Wood Procurement - 2010-59 06/01/2022
M 92 UC Large Wood Storage 2015-131 06/01/2022
N 47 UC Native Plant Restoration and Soil Bio-Engineering - 2010-62 06/01/2022
O 198 Methow Subbasin Vegetation Maintenance - 2010-43 03/21/2023
P 198 Vegetation Maintenance Wenatchee & Entiat 2012-84 06/01/2022
Q 29 UC Strategic Tree Recruitment Services 2022-216 06/01/2022